References

MOSB ELECTRICITY GENERATION INC.

The steam and heating needs of some of the factories operating in the Manisa Organized Industrial Zone are met by transporting the waste heat obtained from the Natural Gas Combined Power Plant installed in the OIZ with pre-insulated welded steel pipes and fittings.

PEKDEMIR FARM

The heating need of the 120,000 m2 closed area greenhouse of Pekdemir Farm, which is the big chain of supermarkets in Denizli, was met by using geothermal pipes and fittings with a length of approximately 5200 m and a diameter of DN400 for the geothermal fluid in the wells located at a distance of 2600 m.

RİXOS SUNGATE HOTEL

As part of the renovation works of Rixos Sungate Hotel, pre-insulated PPRC pipes and fittings were used in the underground domestic hot water and circulation lines.

CAM SAKURA CITY HOSPITAL

Geothermal pipe for the transportation of heating and cooling fluids of the Physical Therapy and Rehabilitation Hospital, which was built separately from the main hospital block in the Başakşehir Çam and Sakura City Hospital Project, which has a bed capacity of 2,682 and a closed construction area of 1,000,000 m2, made by Rönesans Holding with the Public Private Partnership model of the Ministry of Health. and attachments are used.

TURKISH AVIATION SPACE INDUSTRY (TUSAŞ) - TAI

Existing buildings and new offices, workshops, etc. to be built in the central campus of TAI in Ankara. The heat requirement of the facilities was met by transporting the fluid in the centrally installed hot water system using pre-insulated steel pipes and fittings.

MAREN ENERGY

Operating in Aydın - İzmir regions, one of the Kipaş Holding Energy Group companies, Maren Maraş Elektrik Üretim Sanayi ve Tic. Pre-insulated steel pipes and fittings were used to transport the geothermal fluid with a temperature of 180-185°C, extracted from the production wells in 10 Geothermal Electricity Production Facilities of A.Ş.

BALCOVA THERMAL HOTEL

Heating system İzmir Geothermal A.Ş. Geothermal pipes and fittings were used in the Balçova Thermal Hotel Project.

SIMAV GEOTHERMAL REGIONAL HEATING

Approximately 72.000 m of pre-insulated steel/PPRC pipes and fittings in DN50-DN400 diameter range were used between 2011-2020 in the city heating system established by Simav Municipality by utilizing the heating energy of geothermal fluid extracted from underground in Simav district of Kütahya and having a temperature of approximately 98°C.

SANDIKLI ONE-STOP DISTRIBUTION PROJECT

Approximately 12.600m of pre-insulated steel/PPRC pipes and fittings in the DN150-DN400 diameter range were used to heat the existing greenhouses and approximately 1,000,000m2 greenhouses to be established in the future by utilizing the heat energy of the geothermal fluid extracted from the underground in the Sandıklı district of Afyonkarahisar and at a temperature of approximately 80°C. .

ZORLU ENERGY

Approximately 9.500m of pre-insulated SSAW steel pipes and fittings in the DN400-DN900 diameter range were used in the re-injection lines of Kızıldere-3 Geothermal Power Plant, which is the world's leading and Turkey's largest geothermal power plant with an installed power of 165MW.

GAZİ UNIVERSITY

In the central heating system of Gazi University Faculty of Education, approximately 4.600 m of pre-insulated steel pipes and fittings are used in the DN50-DN250 diameter range.

TÜPRAŞ

Industrial type pre-insulated pipe was used in the 180°C superheated steam flow line and standard type pre-insulated pipes and fittings were used in the condensate line within the scope of the "Waste Station Pump Facility Construction Work" at TÜPRAŞ's İzmir Refinery.

OYKA PAPER PACKAGING

Pre-insulated package pipes and fittings are used in the heating system of some of the buildings at OYKA Paper Packaging facilities, which is located in Zonguldak Çaycuma and is a subsidiary of OYAK.

ETİ BAKIR A.Ş.

Pre-insulated pipes (a total of 2.000 m in various diameters) and their fittings were used in the central heating system of the new buildings to be constructed at the facilities of Eti Bakır A.Ş. in Samsun Tekeköy. Pre-insulated pipes are installed directly buried in the ground.

TURKISH OIL A.O. (TPAO)

Industrial type pre-insulated pipe (a total of 2.000 m in various diameters) and its fittings were used in the 150°C superheated water central heating system of the buildings within the borders of the Headquarters Complex of TPAO in Ankara. Pre-insulated pipes are mounted inside the gallery.

UKRAINE CITY HEATING PROJECT

Within the scope of the project, which was carried out with the grant of the European Union and aims to improve the municipal services of four cities selected as a pilot in Ukraine, İZOBOR brand pre-insulated package pipes (in various diameters in total 7,000 m) and its fittings were used in the central city heating system of these four cities.

RODER LOGISTICS BASE

In the central heating system of all buildings in the Logistics Base, which was established in Ankara's Kazan district and contracted by Özçelik & İmaj-Tan Partnership, pre-insulated package pipes (a total of 6.000 m in various diameters) and their fittings were used. Pre-insulated pipes are installed directly buried in the ground.

TUTES

Geothermal pipes and fittings were used in the heating installation of Tunçbilek Thermal Power Plant (TUTES) in Kütahya.

BOTAŞ

In the process line of BOTAŞ' Natural Gas Compressor Station in Ardahan Hanak, geothermal pipes installed directly buried in the ground were used.

TUZLA JES

Tuzla Geothermal Power Plant with an installed capacity of 7.5 MWe, located in Tuzla, within the borders of Ayvacık district of Çanakkale province, is a subsidiary of ENDA Enerji Holding A.Ş. used. Geothermal pipes are installed directly buried in the ground.

GENERAL DIRECTORATE OF METEOROLOGY AFFAIRS

Within the scope of the "Heat Center Modernization Construction Work" of the buildings within the borders of the Headquarters Complex in Ankara, the pre-insulated pipe and its fittings were used, partially buried directly in the ground, and partially mounted inside the gallery, in the central heating system serving all buildings.

DALAMAN AIRPORT

Pre-insulated package pipes and fittings are used in the central cooling line of the airport in Dalaman, Muğla.

VEGE VITAL GREENHOUSE

The geothermal fluid from underground was used to heat the 100-decare greenhouse in Bergama, İzmir. The geothermal fluid was transported to the greenhouse by geothermal pipes installed directly buried in the ground.

BOĞAZLIYAN SUGAR FACTORY

In Boğazlıyan Sugar Factory, which was established in Yozgat and contracted by the OEP Partnership (OYAK-EKON-PROKON), geothermal pipes installed directly buried in the ground were used.

İSDEMİR

İskenderun Demir ve Çelik A.Ş., a subsidiary of OYAK and located in İskenderun. Pre-insulated package pipes and fittings were used in the heating system of some of the buildings in the facilities.

ERDEMIR MINING

Pre-insulated pipes and fittings are used in the heating system of the buildings in ERMADEN facilities, which is located in Sivas Divrigi and is a subsidiary of OYAK.

ERZURUM EGT. ARŞ. HOSPITAL

In the heating system of the 400-bed Training and Research Hospital in Erzurum, pre-insulated pipe (a total of 2.000 m in various diameters) and its fittings were used.

GLI

Geothermal pipes and fittings were used in the heating installation of the Garp Lignites Enterprise (GLI) in Tavşanlı, Kütahya.